close

WASHINGTON "The new project is completed in the middle of this month the plant top knot, now underway interior painting, windows and doors installation and other projects, from the start until the last four months." Recently, the general manager Wong Electrical Equipment Co., Ltd. Huzhou technology Xushao Bin habit walked to the window of the office, take a look at the new plant is being erected across the. In a dual Town Industrial Park, with a total investment of 130 million yuan of annual output of 3,000 tons superfine wire project started since the end of August, and constantly refresh the progress of construction, it is expected to be completed in March next year.enamelled copper wire prices for Shaver Ecuador After looking down, this is the second expansion of technology-ming electrician. 2012, Xushao Bin rented 1,000 square meters of factory buildings, less than a year, it expanded to 2,000 square meters. Wait until the third year, he began the new plant will expand the factory area to 22,000 square meters, production capacity has increased to 3,000 tons. "Products in short supply this year, sales have reached more than 800 tons. Because of lack of production capacity, but also discouraging nearly 30% of the orders." Production supervisor the Duties, currently seven production lines 24 hours at high speed, production reached 2 tons many. Even so orders, compared to a steady stream of production capacity still appeared to be inadequate. As soon as possible in order to enhance productivity, speed up construction projects become a priority. To this end, the construction side arrangement two team approach, were responsible for two things Area. "According Area accountability, to finish the work, ensuring quality, speeding up the project." Construction of the person in charge Xing Shen said.online shop enameled aluminum wire china In addition to speed up progress, but Xushao Bin also begin to shop for a new layout. According to the plan, the new unit price of 2 million yuan to introduce automatic production line 20. This means that the "machine substitutions," the results will be more obvious, each worker is responsible for the production line increased 3 from 1. Ming Electrical Technology workshop also new factory full use of space resources, using double plant design. Due to the weight of the larger wire, if using double the plant, during transport, the additional costs. But the technology-ming electrician main areas ultrafine wire, similar to the headphones, ignition coils, air-conditioning timer and other products, but this design intensive space. "The new project, once commissioned, will become the largest in East China total size of the first ultra-enameled wire production base value per ton of copper will be about 3 to 50,000 yuan." he said.

arrow
arrow
    全站熱搜

    sunnyrose 發表在 痞客邦 留言(0) 人氣()